An upscale gabled home with light brick, black-framed windows and a generous autumn lawn beside a bronze-leaved oak.

Lone Tree RidgeGate East Side: What's Open and What's Still Coming

October 15, 2026

If you've driven RidgeGate Parkway east of I-25 lately, you've seen a lot of orange fencing. How much of it is open to the public yet? Not much, and the order things open is the useful part. The first public pieces are a café, a bikeway, a creek bridge and a few trail links. The places those links lead to come later. The King Soopers and the regional park are both set for 2027.

So for now, east-side Lone Tree is a place you travel through more than a place you go to. That changes over the next year as the destinations catch up.

The One Public Spot That's Open Now

The Groove Café sits inside the Lyric Amenity Center at 10930 Lyric Street. The city's July–August Timberlines magazine says it's open to the public. It serves coffee, breakfast, lunch and dinner, then becomes a full-service restaurant and bar in the evening. The 7,500-square-foot amenity center opened in June. The café is the public part of it. The fitness building, pool and gathering spaces are for Lyric homeowners only.

Check the hours before you go, because they've changed since summer. The magazine listed a 6 p.m. close Sunday through Wednesday. The café's website, updated October 8, now lists:

  • Monday and Tuesday: 7 a.m. to 6 p.m.
  • Wednesday, Thursday and Sunday: 7 a.m. to 8 p.m.
  • Friday and Saturday: 7 a.m. to 9 p.m.

Fridays bring Friday Night Live, a weekly live-music night. The summer magazine gave the time as 5 to 8 p.m. The rest of the October lineup is Rene Moffatt on the 16th, Antonio Lopez on the 23rd and Patrick Dethlefs on the 30th. A Douglas County News-Press profile of the menu listed chilaquiles, egg, ham and cheese empanadas, house-made pizza dough and focaccia, and fish and chips battered daily. The profile isn't dated, so check the current menu online before you go.

The café also hosts city events. Timberlines listed a "Connect with Council" morning at The Groove on Tuesday, October 27, from 7:30 to 9:30 a.m. That's a chance to ask council members in person about the projects below.

Lyric explains why a café arrived before a grocery store. Shea Homes is building it on 700 acres, with about 1,900 homes planned and more than 100 finished so far. A neighborhood amenity center can open early in a project like this. A shopping center has to wait until there are enough households nearby.

Getting There by Rail

Light rail already reaches the east side. The E and R lines stop at Lone Tree City Center Station, 11023 RidgeGate Parkway, according to RTD's station page. The city sent people to RidgeGate Parkway Station on the same lines for its Oktoberfest and Fall Festival at Schweiger Ranch earlier this month.

The gap has been getting from those stations to the trails, the ranch and the new neighborhoods on foot or by bike. The next projects to finish close that gap.

What Finishes This Winter: The Havana Street Bikeway

The September–October issue of Timberlines says the South Havana Street Bikeway is in its final stages, with completion expected "this winter." The magazine doesn't give a month. The project runs along South Havana Street from Rail Way to Surrey Drive. It adds dedicated bike lanes, pedestrian improvements, ADA-compliant ramps and a new traffic signal at one intersection.

The city calls it the missing link in the regional bike network. It connects RidgeGate Parkway to the Happy Canyon Creek Regional Trail and improves access to RTD stations, Schweiger Ranch and Tall Tales Ranch. The magazine also notes that Havana is already a popular recreational bike route in northern Douglas County. The City of Lone Tree owns the project, with funding from the Colorado Department of Transportation and the Rampart Range Metropolitan District.

Tall Tales Ranch helps explain the location. It's a planned community. It's being built on four acres leased from the Schweiger Ranch Foundation, directly across from the RidgeGate Parkway light rail station. The bikeway, the station and the ranch all sit in one small area.

The Bridge That Connects Havana to the Creek Trail

Douglas County is building the next connection. In January 2026, county commissioners approved a contract for a pedestrian bridge over Happy Canyon Creek. It's part of a trail link from the South Havana Street sidewalk near Tall Tales Ranch, across the creek, to the Happy Canyon Creek Regional Trail. The county leads the project with Lone Tree, Tall Tales Ranch, Parker Water and Sanitation District, and South Suburban Parks and Recreation. Timberlines says the link will also make it easier to reach the Havana Street RTD station.

What Arrives in 2027

Once those connections are done, the destinations start opening. Here's what has a date, in order:

  1. Lone Tree Village and King Soopers Marketplace. The project broke ground April 10, 2026, and the city expects it to open in 2027. The city's project page lists a stand-alone grocery store, six smaller retail buildings and a gas station. It sits between the westbound and eastbound lanes of RidgeGate Parkway, next to High Note Avenue and Rhapsody Road. The city lists it as "Active Construction" and hasn't named tenants for the six smaller buildings.
  2. High Note Park, Phase 1. Lone Tree and South Suburban broke ground April 29, 2026, along Happy Canyon Creek near I-25 and RidgeGate Parkway. South Suburban's project update targets late summer 2027. Phase 1 plans include two lighted multipurpose fields, a playground, a dog park, a water feature, a food-truck area, a beer garden and connections to the Happy Canyon Trail. The city calls it Lone Tree's first and only regional park.

Both of these depend on the trail links above. The park will tie into the same trail network the Havana bikeway and the county bridge are filling in.

What Has No Date Yet

Two projects you might expect to be close don't have firm dates, and these are the ones easiest to overstate.

Badger Gulch Park. This 3.36-acre park is in the Couplet District, next to the RidgeGate Senior Housing development. Coventry Development and the Rampart Range Metropolitan District are building it. Plans include a pavilion, picnic tables, a restroom, a demonstration garden, fitness equipment, play areas and public art. The centerpiece is a pedestrian bridge to the Badger Gulch Regional Trail that connects the Couplet District to Lyric. It was designed to curve around mature cottonwoods along the creek. One of those big cottonwoods fell before the bridge went in, because its old, hollow trunk could no longer hold its weight. The city says the design still centers on protecting the creekside habitat. The city's project page says "Active Construction" and gives no opening date.

The Happy Canyon Trail. Rampart Range Metro District and the Mile High Flood District are building it. It will connect Douglas County's East/West Trail up on the bluffs, Schweiger Ranch and High Note Park, and pass under RidgeGate Parkway. The city describes it as under construction. We haven't found official word that any section is open, or any listed trailhead or parking.

Once these two are done, the east side will have parks and trails within walking distance. The Havana Street work this winter is the first step toward that.


If you live near RidgeGate and want to know how these openings could affect your plans, I follow these projects closely and I'm happy to talk through them. Angela Chavez is always glad to hear from neighbors. Let's Connect.

Work With Angie

Experience a elevated approach to real estate built on trust, local expertise, and personalized service. Whether you are buying your dream home or selling a prized property, Angie provides the strategic guidance to turn your vision into reality.